TankScope
Route
Tank 01
R.M. · 180 gal · Cherry Creek
Water
0 of 5 entered
Alkalinity
target 7.5–9.0 dKH · was 8.1
Calcium
target 400–450 ppm · was 450
Magnesium
target 1300–1400 ppm · was 1350
Nitrate
target 2–25 ppm · was 25
Phosphate
target 0.02–0.10 ppm
Done today
Overflow slits scrubbed
Powerheads scrubbed
Sand bed stirred
Filter sponges cleaned
Skimmer cup cleaned
Glass cleaned
Water change
Filter socks swapped
Pumps checked
Return line checked
Algae basted
Livestock checked
Dosed
amounts, not intentions
A recorded number is something a second tech can repeat.
Parts used
Watching
goes to the customer
Finish & send report
Route
Tanks
Activity