Tank 03
D.P. · 250 gal · 5 visits on record
Standing note Return line rebuilt to 3/4in continuous from pump — previous stepped reduction caused back-pressure and a seeping joint.
Alkalinity
target 7.5–9.0 dKH
8.0
Calcium
target 400–450 ppm
440
Magnesium
target 1300–1400 ppm
1340
Nitrate
target 2–25 ppm
38High
Phosphate
target 0.02–0.10 ppm
0.0959d ago
Not enough readings yet to draw a trend